Beef / Chicken / Duck Meat Pet Food Extrusion Equipment Dog Treat Beef Stick Snack Making
Product Details:
Place of Origin: | Jinan,Shandong Province |
Brand Name: | DARIN |
Certification: | CE Certificate |
Model Number: | DR-200 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 sets |
---|---|
Price: | USD |
Packaging Details: | We could supply Export Standard Wooden Case, suitable for long trip and loading & unloading. |
Delivery Time: | 35 working days after receiving the down payment |
Payment Terms: | T/T, L/C, Western Union, D/A |
Supply Ability: | 50 Sets per year |
Detail Information |
|||
Name: | Beef Treats Making Machine | Usage: | Jerky Treats Dog Snacks |
---|---|---|---|
Warranty: | 1 Year | Capacity: | 300~500kg Per Hour |
Power: | 18kw | Dimension: | 4.3*0.9*2m |
Worker Needed: | 1~2 Workers | Original: | China |
Highlight: | feed extruder machine,dog food extruder |
Product Description
Beef/Chicken/Duck meat dog treat beef stick pet snack making machinery
Product Application
Auto Meat Strip Processing Line is an auto processing line can produce dog treat type jerky treats. With different moulds, various shapes can be made, such as strip, stick, screw shape, etc. Also, we can provide all kinds of recipe to make different tastes to full the demands of pet both for nutrition and chewing hobby.
Main Features
Application: | Meat Foods. |
Machine Material:
|
Stainless Steel 304 |
Type: | DR-200 |
Capacity: |
300-500kg/hr
|
Certification: | CE & ISO9001 |
Place of Origin: | Jinan, Shandong, China. |
Motor: | WEG, Germany |
Electric Parts: |
ABB, Switzerland or Schneider, France
|
PLC and Touch Screen | Siemens, Germany |
Bearing:
|
NSK, Japan |
Voltage / Frequency: | Customized |
Operation: | PLC screen control. |
Payments: | T/T, L/C, |
Delivery time:
|
35 working days.
|
Our service
Before | During | After |
1. According to the clients'special requirement, offering the reasonable plan and free design helping to select the equipment. | 1..Inspect the machine before leaving the factory. | 1. We will provide 1-2 engineer to the client's factory for the installation and teach totally in 10 days. The client need provide room, food, round-trip transportation, visa and a nominal $100 daily subsidy per person. |
2.Provide the standard device and the flow chart | 2.Welcome to visit our factory or the domestic clients’ factory. | 2. Provide the basic formula |
3.Provide the free consultation of the equipment | 3Help client design the factory and offering professional advice, free engineering drawing for the factory layout. | 3. Train the first-line operator. |
4. Operation/ Service/ Maintenance Manual: Provided In English. | ||
5. Oversea install and debug the equipment. |
Sample: