Popular Pet Food Extruder 100% Natural Duck Jerky Dog Treats Forming Machine
Product Details:
Place of Origin: | Jinan,Shandong Province |
Brand Name: | DARIN |
Certification: | CE Certificate |
Model Number: | DR-200 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 sets |
---|---|
Price: | USD |
Packaging Details: | We could supply Export Standard Wooden Case, suitable for long trip and loading & unloading. |
Delivery Time: | 35 working days after receiving the down payment |
Payment Terms: | T/T, L/C, Western Union, D/A |
Supply Ability: | 50 Sets per year |
Detail Information |
|||
Machine Name: | Pet Jerky Treat Machine | Usage: | Jerky Treats Dog Snacks |
---|---|---|---|
Warranty: | 1 Year | Capacity: | 150kg/hr |
Power: | 18kw | Dimension: | 4.3*0.9*2m |
Worker Needed: | 1~2 Workers | Original: | China |
Material: | Stainless Steel | ||
High Light: | Jerky Dog Food Processing Machinery,Jerky Dog Treat Making Machine,100% Natural Pet Food Extruder |
Product Description
Popular selling China 100% Natural Duck Jerky Dog Treats forming machine
Product Application
Auto Pet jerky treat machine is an auto processing line can produce dog treat type jerky treats. With different moulds, various shapes can be made, such as strip, stick, screw shape, etc. Also, we can provide all kinds of recipe to make different tastes to full the demands of pet both for nutrition and chewing hobby.
Main Features
Application: | Meat Foods. |
Machine Material:
|
Stainless Steel |
Type: | DR-126 |
Capacity: | 150kg/hr |
Certification: | CE & ISO9001 |
Place of Origin: | Jinan, Shandong, China. |
Motor: | WEG, Germany |
Electric Parts: |
ABB, Switzerland or Schneider, France
|
PLC and Touch Screen | Siemens, Germany |
Bearing:
|
NSK, Japan |
Voltage / Frequency: | Customized |
Operation: | PLC screen control. |
Payments: | T/T, L/C, |
Delivery time:
|
35 working days.
|
Machine Picture
Commissioning Service
1. We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply for the Visa to client’s country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning
service, and we supply 1 year guarantee from the date of completion of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and daily salary USD 100 are on client’s account.