Moulded Dog Treat Machine For Chewing Pet Dumbbell / Dog Chewing Toys
Product Details:
Place of Origin: | Jinan,Shandong Province |
Brand Name: | DARIN |
Certification: | CE Certificate |
Model Number: | DM268 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 set |
---|---|
Price: | Negotiation |
Packaging Details: | We supply standard export wooden cases, suitable for long-term trips and mul-times loading & unloading by forklift. If needed, please extra pay for the packages. |
Delivery Time: | 45 working days |
Payment Terms: | L/C, D/P, T/T, Western Union |
Supply Ability: | 99 sets per year |
Detail Information |
|||
Name: | JINAN DARIN Moulded Pet Chewing Food Injeciton Machinery With CE Certified | Application: | Pet Dog Treats |
---|---|---|---|
Weight: | 5000KG | Voltage: | 380V, 50HZ |
Power: | 89kw | Guarantee: | 1 Year |
Spare Parts: | 1 Set | Mold: | Various Shape |
High Light: | animal food making machine,dog treat making machine |
Product Description
Moulded Pet Injection Molding Machine for Chewing Pet dumbbell/Dog Chewing toys extruding machine
Introduction
JINAN DARIN Moulded Pet Chewing Food Injeciton Machinery with CE Certifiedcan by adjusting the raw materials, process parameters, such as temperature, moisture, make the products with novel shape, unique taste, rich nutrition, the organization is exquisite characteristic, is suitable for the taste different pets.This dog food production equipment widely used in dogs, cats, fish and shrimp, fox, and various kinds of pet food production, is the ideal choice.
Before & During & After Sales Service
Before | During | After |
1.Provide the free consultation of the equipment | 1.Help client design the factory and offering professional advice, free engineering drawing for the factory layout. | 1. Oversea install and debug the equipment. |
2.Provide the standard device and the flow chart | 2.Welcome to visit our factory or the domestic clients’ factory. | 2. Train the first-line operator. |
3. According to the clients'special requirement, offering the reasonable plan and free design helping to select the equipment. | 3.Inspect the machine before leaving the factory. | 3. Provide the basic formula |
4. Operation/ Service/ Maintenance Manual: Provided In English. | ||
5. We will provide 1-2 engineer to the client's factory for the installation and teach totally in 10 days. The client need provide room, food, round-trip transportation, visa and a nominal $100 daily subsidy per person. |
Number | Main Advantages |
1 | Pet Treats Injection Molding Machine equipped with 4 stages injection, 3 stages holding pressure and 3 stages back pressure. |
2 | EL display of pressure, speed, time and distance for each motion. |
3 | Output quantity and packaging quantity of pet toy chews food can preset. |
4 | Abnormal shot detection. |
5 | Screw rotating speed can read-out |
6 | Dust, oil proof and colorful touch switch control panel. |
7 | Screw cold start protection. |
8 | SSR-solid state temperature controller. |
9 | Super low pressure clamping ensures security of user, and maintains lifespan of machine efficiently. |
10 | Clamping, injection and ejection (option), and carriage action (option) by linear potentiometer. |
11 | Pet Treats Injection Molding Machine equipped with 4 stages injection, 3 stages holding pressure and 3 stages back pressure. |
12 | Security code function to avoid missing data or careless changing. |
13 | Shut-down device with 100 presets mold data memory. |
Commissioning Service
1. We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply for the Visa to client’s country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning
service, and we supply 1 year guarantee from the date of completion of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and daily salary USD 100 are on client’s account.
FAQ
1. Could we visit your factory to check the machine carefully and closely?
You’re more than welcome to visit Darin, will provide machine test running, face to face discussion and turnkey project design solution.
2. Could you afford technician team to guide our installation and commissioning?
Oversea commissioning service provided, our technician will help to install the machine, and teach local workers about operation and maintenance. Buyer should pay for the technician's round flight ticket, accommodation and salary.
3. How long is your machine's guarantee time?
One year since the machine arrive your factory.
4. If some parts break after warranty, what should we do?
Darin supply full-life after sales service, whenever new parts needed, we will help to supply new ones at reasonable price & in shortest time.
5. If we show our workshop size, can you design layout for the whole line?
Auto CAD layout will be provided as client’s workshop size.
6. What is the material of the machine?
Stainless steel, especially parts contacting with materials, conforming to food grade.