Healthy Snack Chocolate Nut Cereal Energy Bar Forming Machine / Cereal bar making machine
Product Details:
Place of Origin: | Jinan,Shandong Province |
Brand Name: | DARIN |
Certification: | CE Certificate |
Model Number: | DRC-55 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 set |
---|---|
Packaging Details: | wooden case |
Delivery Time: | 30 workingdays |
Supply Ability: | 50set/month |
Detail Information |
|||
Features: | Continuous & Automatic | Place Of Origin: | Shandong, China (Mainland) |
---|---|---|---|
Material: | SUS304 | Advantage: | Various Size And Shape |
Recipe & Formula: | Provide Free Of Charge | Manual: | English Version |
High Light: | peanut bar making machine,cereal bar making machine |
Product Description
Application:
The machine is mainly suitable for caramel treats, swelled candy rice, corn crisp, melon seeds crisp, black rice crisp that are square. It has advantage of operating simply, usingconveniently, producing in large quantity, cutting for good shape, adjusting length arbitrarily. Recently it is popular in the market.
Our advantages for rice bar forming machine
A | Save the artificial, a skilled can operative three machines |
B | Shorter time, puffed corn takes only six minutes once |
C | Energy savings: Unit finished lower energy than the ordinary type |
D | Safe and convenient operation: four safety insurance, provincial testing,reduce labor intensity, user-friendly design, easy operation workers |
E | More convenient to collect the material, the inclined position of 35 degrees to discharge the material collected |
F | All-round shock, equipment and guide, gauge durable |
G | Low noise design |
Features:
1. Double frequency conversion control, leveling the cuttings in once time.
2. With a number of flat structure, suppressing flat, thickness uniformity.
3. Advanced frequency control of motor speed can meet your needs in different products.
4. Automatic cutting which is saving time, saving labor, economic, convenient.
Commissiong Service
1.We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc. |
|
2.After delivering machines to client’s factory, we start to apply for the Visa to client’s country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service. | |
3.1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time. | |
4.Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
|
|
5.It normally costs 10 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.
|
|
6.The engineer’s round-trip flight tickets, accommodation and daily salary USD 100 are on client’s account. |