60T Double - station Germany motor PLC Control Rawhide Bone dog food machinery
Product Details:
Place of Origin: | Jinan,Shandong Province |
Brand Name: | DARIN |
Certification: | CE Certificate |
Model Number: | DR-60T |
Payment & Shipping Terms:
Minimum Order Quantity: | 1set |
---|---|
Price: | USD17300~17500 Per set |
Packaging Details: | wooden case, which is suitable for long-distance transportation, multi-time loading & unloading for fork trucks. |
Delivery Time: | 45 working days |
Payment Terms: | L/C, T/T, Western Union |
Supply Ability: | 20 sets per month |
Detail Information |
|||
Name: | Rawhide Bone Pressing Machine | Brand: | Darin |
---|---|---|---|
Model: | DR-60T | Theory Output: | Max. 60t |
Layout: | AutoCAD Layout As Client's Workshop | Manual: | English |
Weight: | 1800KG | ||
High Light: | pet food machine,dog food maker machine |
Product Description
60T Double - station Germany motor PLC Control Rawhide Bone dog food machinery
Detailed product description
DR-60T Rawhide Bone Pressing Machine could produce pet bone with rawhide as raw materials.
Why Choose Us?
Number | Description |
1 |
Germany motor, three years worldwide guarantee |
2 |
Double-station, double molds, it can improve the efficiency |
3 | Touch screen with Schneider electric parts |
4 | Wide range of application, the material can be used cow hide,Sheepskin, pig skin,Fish skin. |
5 | You can adjust the size of your products, it is easy to change the molds |
6 | Simple operation with good safety protection |
Raw materials:
cow hide,Sheepskin, pig skin,Fish skin.
Technical parameter
Model |
DR-60T |
Theory Output |
Max 60t |
Working Surface Size |
Left and Right 500mm |
Working Surface Size |
Front and Back 400mm |
Height of Working Table to the Ground |
780mm |
Max. Stroke of Mobile Mould | 350mm |
Motor Power |
9KW |
Weight |
1800KG |
Dimension |
2500 x 1200 x 1900mm |
Commissioning Service
1. We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply for the Visa to client’s country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning
service, and we supply 1 year guarantee from the date of completion of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and daily salary USD 60 are on client’s account.