Muesli Granola 600kg/Hr Cereal Bar Making Machine
Product Details:
Place of Origin: | Jinan,Shandong Province |
Brand Name: | DARIN |
Certification: | CE Certificate |
Model Number: | DRC-75 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 set |
---|---|
Price: | USD |
Packaging Details: | export wooden cases |
Delivery Time: | 45 working days |
Payment Terms: | L/C, D/P, T/T, Western Union |
Supply Ability: | 99 sets per year |
Detail Information |
|||
Name: | 400-600kg/hr Cereal Bar Making Machine Muesli Bar Granola Bar Cutting Machine | After-sales Service: | Full Life |
---|---|---|---|
Layout: | Auto CAD Format According To Client's Workshop | Output: | 400-600kg/hr |
Service: | English | ||
High Light: | 600kg/Hr Cereal Bar Making Machine,15.2kw Cereal Bar Making Machine,CAD Cereal Bar forming machine |
Product Description
Cereal Bar Equipment Muesli Bar Granola Bar Cutting Machine
Introduction

Motor | WEG or Siemens | Mixing Tank and Conveying Belt | HMWHDPE |
PLC & Touch Screen | Siemens | Mixing Blade, Mold and Hopper Blade | PTFE |
Electric Parts | ABB or Schneider | Cover Body | Stainless Steel |
Technical Parameters
Output | Installed Capacity | Voltage / Frequency | Dimension | Workers Required |
400-600kg/hr | 15.2kw | 380V 50Hz | 6.65 x 1.31 x 2m | 3-4 workers |
Product Picture
Our service
1. We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply for the Visa to client’s country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and daily salary USD 100 are on client’s account.

Contact