Continuous & Automatic Seed Cereal Bar Making Machine / dates cereal bar cutting machinery
Product Details:
Place of Origin: | Jinan,Shandong Province |
Brand Name: | DARIN |
Certification: | CE Certificate |
Model Number: | DRC-75 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 set |
---|---|
Packaging Details: | wooden case |
Delivery Time: | 35-45 working days |
Payment Terms: | T/T, L/C, D/P or Western Union |
Supply Ability: | 99 sets per year |
Detail Information |
|||
Name: | Sesame Seed Candy Making Machine/peanut Candy Maker Machine With CE | Material: | SUS304 |
---|---|---|---|
Condition: | Continuous & Automatic | Manual: | English Version |
After-sales Service: | Full Life | Layout: | AutoCAD Format According To Client’s Workshop |
High Light: | chocolate Bar Making Machine,rice cake making machine |
Product Description
Seed Cereal Bar Making Machine / dates cereal bar cutting machinery
Introduction
Automatic peanut candy, rice candy, melon seeds candy cutting machine, realizes gentle pressure forming, regular shapes ,beautiful appearance.
Peanuts material mix sugar after pour into the hopper machine, machine automatic points in material, fabric, soft pressure, cooling and demoulding, finish the delivery. Capacity up to 300-400kg/hr.
Technical Parameters
Output | Installed Capacity | Voltage / Frequency | Dimension | Workers Required |
300-400kg/hr | 9kw | 380V 50Hz | 8 x 4 x 2m | 3-4 workers |
Our service
1. We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply for the Visa to client’s country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and daily salary USD 100 are on client’s account.